How should the floor be prepared for the installation of prefabricated units? Are there any requirements regarding recess depth and size around the units? For example, to set the framework for the units floor up to the same level as the surrounding floor?

It is requested that the footprint of the pod is drawn on the slab when the units is placed directly onto the slab, marking the loading points where the neoprene pads (spacers) have to be put, complying with the project design work. In case of a slab recess, the depth of the recess can vary project by project, but this will be established during the design period, before beginning the design of the related pod serial number.